Semi Hoop

EOFY Special until June 30 2017. 10% off and 2 weeks to dispatch. All made-to-order.

The wide U-shaped bicycle stand wholly supports the bicycle at two points. Complies with AS2890.3 Class 3.

Open Technical Sheet (recommended) | Open Colour Chart
Not exactly what you need? Call 1300 027 799 or make an online enquiry for a tailored solution.

EOFY Special until June 30 2017. 10% off and 2 weeks to dispatch. All made-to-order.

The wide U-shaped bicycle stand wholly supports the bicycle at two points. Complies with AS2890.3 Class 3.

Open Technical Sheet (recommended) | Open Colour Chart
Not exactly what you need? Call 1300 027 799 or make an online enquiry for a tailored solution.

choose metal

Stainless Steel No.4 Finish (304 or 316) or Hot Dipped Galvanised Steel

australian standards

Complies with AS2890.3 Class 3.


at a glance

    • Price Range: Less than $500
    • Maintenance Level: Easy – Medium

Spare parts are readily available.

ORDER SPARE PARTS

specifications

Choose an option per category to specify your product.

Code
BST03

Dimensions (mm)
845W x 850H

Ø42 Pipe
• Galvanised Mild Steel
• Stainless Steel 304 Linished
• Stainless Steel 316 Linished


Mounting
• Surface
• Subsurface

Tailored options are available for all Street Furniture products. Additional fees and lead times may apply.


related projects

Sydney Park

Sydney Park in St Peters is a popular destination for families and residents of Sydney’s inner west. The addition of a number of Classic Plaza Seats and Classic Plaza Benches in Jarrah provide a welcome resting place within this 40-hectare parkland. The installation of Semi Bike Stands, a U-shaped stand which supports a bicycle at each end, encourages the use of bikes and offers yet another way to discover this natural wonderland.

  • 3 feb 2015
read more

Hamilton Harbour

Tailored Frame Bins Enclosures, Semi Hoop Bike Parking and Stainless Slim Bollards used around new mixed-use complex.

  • 4 feb 2015
read more

Noosa Junction Station

The state-of-the-art transit facility was built over an eight-month period between October 2010 & May 2011, officially opening in August 28, 2011. The station provides high-quality public transport infrastructure for TransLink bus services and tourist coaches in the Noosa region. Incorporating seven bus stops across two bus platforms, the state-of-the-art facility provides a tourism and transport hub for the community and was designed by local architects to reflect the look and feel of the iconic Noosa region.

  • 3 feb 2015
read more